AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
![]() There should also be an assembly and disassembly plan for the crane. A survey of underground infrastructure should also be completed prior to lifting operations to make sure the crane isn’t set up over an item that could rupture beneath it. It shall also be set up on proper matting as required on firm, level ground. In all cases, the crane shall be set up properly according to the manufacturer specifications. We should note below that gross load means all of the load acting on the boom or jib tip and any other deductions that need to be taken into account. We will walk thru some criteria that could be set forth for a standard lift, a non-standard lift, and a critical/engineered lift. Some organizations just have two levels of lift plans: standard or critical/engineered. Another example could be a standard lift, a critical lift and an engineered lift. Each of these has criteria that build off of each other. One example of this setup is having a standard lift, non-standard lift, and a critical lift. ![]() Most organizations have created certain levels of lift plans based on the level of risk involved with the lift. To mitigate this risk, it is best to create a lift plan to help vet out the risks involved and make everyone involved aware of the risks. When completing lifting operations, there is always a level of risk involved.
0 Comments
Read More
Leave a Reply. |